Bottlehead Forum

Bottlehead Kits => Crack => Topic started by: cddc on December 06, 2016, 12:26:16 PM

Title: Completed work of Crack before voltage check (and before Speedball upgrade)
Post by: cddc on December 06, 2016, 12:26:16 PM
So finally the Crack building was done!

4 fly leads were added for possible future Cap upgrades.

Fingers crossed...hoping no anomalies show up during the coming wiring check and voltage check.