Hello All,
I just started my CRACK build by painting the transfer cover and the case. After finished the part installation (no soldering yet), I review the instruction manual and I am really puzzled by how I could ever get 0ohm from terminal 22 to GND: the instruction basically tries everything it can to AVOID the long screw touch the chassis by inserting the nylon shoulder washer and fiber shoulder washer, I don't see anyway Terminal 22 can have a path to GND. Also if T22 has 0ohm resistance to GND, I would expect terminal 11, 16, 17 to do the same but they are not mentioned in the resistance check.
Did I miss anything? I am an electrical engineer so I know the basics.
Thanks for all the helps,