More good headway today. We leased one third of a larger space for our office. The building was being used by a high tech firm before us, and it was heavily wired for network and phone. Unfortunately all the LAN cables (must have been 50 or so, these guys even had a fiber drop installed) came to a hub in the part of the space that we didn't lease. So we spent the first half day pulling about 17 cables that went to ports in our part of the building thru walls and along chases, and then spent the second half figuring out which cable went where with a continuity beeper and labeling them. In the end we found we have one to four LAN ports in every room but the bathroom. Tomorrow we terminate cut and rerouted LAN cables, hook up switchers and a router and hope the cable guy shows up this week. Once we get internet running we can move in!