Semi-local - door-to-door is about 90 minutes, longer in the summer when the ferries are full of tourists.
Josh's description is accurate. I need to put the fully loaded PSU output on the scope to know which regulator chips I can use for the filaments, and to know how much current I can take out without overheating the PT-7. Then I can finish the second large PC board, which has all the heat sinks.
I had hoped to do all that without using the full chassis, but there are so many wires with high voltage or current it just looked like a disaster waiting to happen, so I'm doing it the slow but clean way. Not really my natural style; there's a reason Doc doesn't usually let me build stuff by myself :^)