After solidworks theory to validate the choice and placement of components (post #96), now place to the construction.
Here are the power supply modifications :
- a SCR PA22000 250 V 220μF to replace the last 220μF capacitor on the power supply
- a C7-X shoke to replace the last 270ohm resistor
input stage modifications :
- Valab 23 stepped attenuator 100k log. The right small speedball board need to be redrilled 5mm away. The top plate needs a larger hole too.
- switchable resistor R1 mod to optimize plate operation voltage for my 12BH7A's
- replacement of the LMJE350 by MJE5731 on the 2 small speedball boards.
- switchable rewiring to accept 7119/5687 input tube (see Modifications to run e80cc/12bh7a/5687 for Crack+Speedball thread
http://bottlehead.com/smf/index.php/topic,5989.135.html)
output stage modifications :
- 2 x 220R grid stopper resistor needed by 7802WB before capacitor upgrade
- two JB JFX 100μF 250V to replace the output electrolytic capacitors
- bypassed by two russian K75-10 Paper In Oil 4.7μF 250V
- bypassed by two russian K72P6 Teflon 56nF 500V
- bypassed by two russian SGM Mica 1nf 350V
(https://forum.bottlehead.com/proxy.php?request=http%3A%2F%2Fwww.4shared.com%2Fdownload%2F3SMRnnbkce%2FCrack-1.jpg%3Flgfp%3D3000&hash=21f667fe585dd04f217440ebdbdad0ebd6cc775e)
(https://forum.bottlehead.com/proxy.php?request=http%3A%2F%2Fwww.4shared.com%2Fdownload%2FZFd3zee9ba%2FCrack-2.jpg%3Flgfp%3D3000&hash=b991b5cd9053c04147fd9dfb8f91c5c4dcfdf9a2)
(https://forum.bottlehead.com/proxy.php?request=http%3A%2F%2Fwww.4shared.com%2Fdownload%2FIyANhkGyba%2FCrack-3.jpg%3Flgfp%3D3000&hash=d29a0614a8f93416d682a797e91fd1eec99d1de6)
(https://forum.bottlehead.com/proxy.php?request=http%3A%2F%2Fwww.4shared.com%2Fdownload%2FMpoWexYNce%2FCrack-4.jpg%3Flgfp%3D3000&hash=37e55df35b02106c855f88f31830eafeb082c0ae)
(https://forum.bottlehead.com/proxy.php?request=http%3A%2F%2Fwww.4shared.com%2Fdownload%2F-TO1RTJrba%2FCrack-5.jpg%3Flgfp%3D3000&hash=ce1284e8027bb2d4740acd6a93c95e687303cac0)